This project conducts aΒ Cost-Benefit Analysis (CBA)Β for two proposed dam construction projects:
The analysis evaluates the feasibility of both projects by assessing their estimated benefits and costs across multiple categories. Using simulations, statistical modeling, and probability distributions, the project identifies the more viable dam for construction.
Β
Estimate Benefits and Costs:
Simulation:
Statistical Analysis:
Goodness-of-Fit Testing:
Recommendation:
Β
Β
Β
Β
Β
Based on the analysis,Β Dam #1Β is recommended due to its higher benefit-cost ratio and probability of favorable economic outcomes.
Β
. βββ Data/ β βββ Cost_Benefit_Analysis.xlsx βββ Analysis/ β βββ Probability_Calculations.xlsx βββ Visualizations/ β βββ BCR_Distributions.png βββ Reports/ β βββ Cost_Benefit_Analysis.pdf βββ README.md
Β
For a detailed analysis, please refer to the full report:
π Cost-Benefit Analysis Report
Β
Feel free to reach out with questions, feedback, or collaboration ideas!
LinkedIn:Β Dr. Syed Faizan
Author: Syed Faizan
Masterβs Student in Data Analytics and Machine Learning
Powered By EmbedPress
Β© 2025 Syed Faizan. All Rights Reserved.